Thorough Planning Prior to the Overhead Crane Installation
Chenotech (Nigeria) Limited carried out a thorough risk assessment, method statement and lift plan were provided. Overhead crane installation can be carried out using existing gantry systems (either self contained or incorporated into the buildings structure) or can be installed onto a new gantry system provided by Granada Cranes. During the overhead crane installation, The crane is mounted on the gantry using another piece of lifting equipment. The lifting equipment chosen to do this job depends on the weight of the crane, the access into the site and the available height clearance.
THE CHALLENGES
PROJECT DETAILS
Categories: | |
Client: | ADDAX PETROLEUM DEVELOPMENT COMPANY |
Location: | ADDAX TMMP OFFSHORE PLATFORM |
Completed: | 2016 |
PROJECT DETAILS
- Expediting and securing all permits, licenses, inspections, sign-offs, and certificates required by HSE officers.
- Coordinating and supervising work performed by crew and outsite suppliers for quality, completeness, schedule, and conformity with plans and specifications/
- Upon substaintial completion of construction, examine work to assure efficacy quality and proper commisioning of equipment.
- Developing a community relations program.